Switches, Hubs (7056)

Check Mode:

Product Description RoHS Price Status Quantity
J9986A - Hewlett Packard Enterprise
J9986A
Packaging: -
HPE - expansion module - Gigabit
Networking Solutions Switches, Hubs
No
1 : USD $3440
Inventory 1610
HPE Aruba Instant On 1430 24G Sw
Networking Solutions Switches, Hubs
No
1 : USD $116
Inventory 1610
HPE Aruba 2930F 48G PoE+ 4SFP+ -
Networking Solutions Switches, Hubs
No
1 : USD $6130.01
Inventory 1610
HPE Aruba 6000 12G Class4 PoE 2G
Networking Solutions Switches, Hubs
No
1 : USD $725
Inventory 1610
HPE Aruba 2930F 48G 4SFP - switc
Networking Solutions Switches, Hubs
No
1 : USD $1415
Inventory 1610
HPE Aruba 6200F 48G Class4 PoE 4
Networking Solutions Switches, Hubs
No
1 : USD $5750.01
Inventory 1610
HPE Aruba 6400 - expansion modul
Networking Solutions Switches, Hubs
No
1 : USD $8620.01
Inventory 1610
R8Q69A - Hewlett Packard Enterprise
R8Q69A
Packaging: -
HPE Aruba 6200M 48Gbps 4SFP+ Swi
Networking Solutions Switches, Hubs
No
1 : USD $6002.01
Inventory 1610
HPE Aruba 2930F 8G PoE+ 2SFP+ -
Networking Solutions Switches, Hubs
No
1 : USD $1307
Inventory 1610
HPE Aruba 6000 48G Class4 PoE 4S
Networking Solutions Switches, Hubs
No
1 : USD $2186
Inventory 1610
Products in the switch and hub family are finished goods products that allow the interconnection of multiple branch circuits in USB or Ethernet networks. Among Ethernet products, interconnection of different transport media such as fiber optic and twisted-pair cabling is also supported, and devices offering PoE support as either power sourcing equipment (PSE) or in a powered device (PD) capacity are also available.

FAQ

Which parts are supplied in stock?

Shenzhen Xiangyang Xincheng Technology Co., Ltd supplies integrated circuits (ICs), resistors, capacitors, inductors and diodes from stock. Open a part number to see the brand and specifications, then request a quote for quantity and lead time. Genuine stock is confirmed when you inquire.

How do I request a quote by part number?

Open the part page and check the brand, package and electrical specifications against your requirement, then send an inquiry with the part number, quantity and target lead time. For several lines, use BOM matching and list every part once.

Do you support BOM matching?

Yes. Send the part numbers, quantities and brands. We check integrated circuits, resistors, capacitors and inductors against current stock, then reply with the quantity that can be delivered and the lines that need to be ordered.